Investment opportunity

Infrastructure projects in secondary raw material processing — for municipalities, regions and private processors

Investment profile

Infrastructure profile

A project with an infrastructure character — long-term feedstock supply agreements, predictable input material, industrial outputs with market value.

Partnership on the ground

Every project is built on a partnership with a municipality, region or private processor. The partner provides feedstock, the site and cooperation during permitting. The investor finances construction and operation.

Path to exit

After the investment is repaid, the partner has the option to join as a minority co-owner of a running operation. The investor keeps a majority stake, or can sell it.

Diversification

A modular approach allows building a portfolio of projects across regions and countries over time.

Proven technology

Proven technology from our technology partners, who have more than 15 years of development behind them and dozens of installations across Europe and worldwide. A demonstration line in the Czech Republic is available at an advanced stage of discussions, to verify operating parameters.

Circular economy

Converting hard-to-recycle materials into valuable industrial feedstock — in line with the EU Green Deal and circular economy principles.

Indicative financial model (per DEPYRO NG1200+ unit)

The figures below come from the technology's financial model. A specific calculation is prepared individually for each project, based on local conditions.

CAPEX

~€5.2M

Technology, peripherals, construction and commissioning of a complete node.

Annual revenue

€2.7–3.0M

Primary revenue: pyrolysis oil sales.
Additional revenue: carbon black, process heat/electricity.

OPEX

€0.8–1.0M

Staff, maintenance, service agreement, energy, operating materials.

EBITDA margin

65–70%

Payback time per model: under 4 years.
At 85% capacity utilisation and current market prices for outputs.

Investment structure

The diagram below shows how the holding company, the operating company (SPV), the local partner and the investor work together.

The BOT model wasn't built at a desk. It grew out of tough questions from experienced investors that forced us to think the entire business model through in full detail. It isn't just a contract — it's a joint undertaking by everyone involved.

DEPYRO SPV cooperation structure diagram

Phase 1 — construction and operation

The investor finances construction and operation of the node through the SPV. The local partner bears none of the upfront costs — they provide feedstock, the site and cooperation during permitting. From day one, they have full visibility of the operating economics.

Phase 2 — partner joins

After the investment is repaid, the local partner has the option to join as a minority co-owner of the SPV. The investor keeps a stake with ongoing returns. DEPYRO provides network management and technology support.

Investors enter project-specific SPVs. Each node operates as an independent unit with its own cash flow. The specific equity structure and SHA (Shareholders' Agreement) are shared after an NDA is signed.

Current project status

Technology

Demonstration line in operation in the Czech Republic. Proven technology from our technology partners, who have more than 15 years of development behind them and dozens of installations across Europe and worldwide. CE certified. ISCC PLUS certification (mass balance) for the output oil as a chemical feedstock is a standard, mandatory part of setting up every SPV.

Pipeline

Active discussions with municipalities and private processors in the Czech Republic and other EU countries. Partner network for Denmark, Germany and the Netherlands in preparation.

Structure

Holding structure defined. SPV model and contract templates (SHA, preLOI) prepared in draft form — full legal finalisation follows the closing of the first pilot project.